- Quiet and clean energy supply.
- 10,907 litres of diesel saved.
- Over 60% of all CO2 emissions (35.2 tonnes) saved.
- 87% of potential running hours (1,336 h) saved.
- Minimal disturbance to people and nature.
Off grid location for an opera
The Wadopera Peter Grimes organized by Nootstroom chose a special location for their rendition of the opera piece. Since the original opera takes place in a fishing village along the Suffolk coast of England, the nature reserve outside of the Frisian village Paesens-Moddergat presented itself as an authentic choice. The Wadden Sea region is on the UNESCO World Heritage List, but a large part of the Wadden Sea falls under the Natura 2000 regulation. However, due to the choice of location, the electricity supply had to be off-grid and silent. The Verno team tackled this challenge to cause as little disruption as possible to people and nature.